Categories
Provo City News

New Pedestrian Bridge Opens in Downtown Provo

The new amenity is located at Provo Central Station near 600 South and 100 West.

Advertisements

By Mike Romero

After months of construction, the Utah Transit Authority has opened the new pedestrian bridge at Provo Central Station. The public celebrated its opening in a ribbon-cutting ceremony yesterday, November 14.

This news is brought to you in part by Spengler Industries.

The goal of the bridge was to improve safety, air quality, and to more efficiently connect downtown Provo to the broader public transportation network. While the bridge is operational, elevators within the structures are not yet usable. They’re still pending inspections from state government.

It cost roughly $7 million to build the bridge. 35% was paid by federal funding and 65% was paid by local sources. The bridge spans two FrontRunner tracks and two Union Pacific Railroad lines near 600 South and 100 West in Provo, Utah. It’s 145 feet long.

For pedestrians, this area is often blocked by trains. This makes crossing difficult, dangerous, and at times impossible. This bridge addresses those challenges.

Photo courtesy of Provo City.
Advertisements

Leave a comment